How to Create and Add Estimate Items in Buildern

How to Create and Add Estimate Items in Buildern

Estimates in Buildern help you calculate project costs, organize materials and labor, and prepare accurate proposals for your clients. In this guide, you will learn how to create estimates, add estimate items, and import existing estimates into Buildern.

June 30, 2026

πŸ“‹ Requirements

Before creating a payment schedule, make sure that:

  • A project has been created

  • You have access to the Estimates module

  • (Optional) Cost codes and pricing settings are configured

Estimate Structure

Estimates in Buildern are organized in a hierarchical structure. This helps keep project costs clear and easy to manage.

Typically, estimates are structured as follows:

  • Groups – Represent major project phases (e.g., Site Preparation, Foundation, Framing).

  • Estimate Items – Individual cost components such as materials, labor, equipment, or subcontractor work.

  • Assemblies – Predefined combinations of multiple estimate items used together.

Using this structure helps organize complex construction estimates and makes them easier to review and convert into proposals.

Access the Estimates Module

To start working with estimates:

  1. Open the project you want to work on.

  2. Navigate to the Estimates module from the left-side menu.
    ​

From here, you can create and manage all estimate items for your project.

Create a New Estimate

To start building your estimate, you first need to add estimate items. In Buildern, you can do this in two ways:

  • Create estimate items manually

  • Import estimate items

πŸ‘‰ Learn more about How to Import Estimates in Buildern

πŸ’‘ Tip - Copying or importing estimates is useful when working on similar projects and helps maintain consistency.

Create Estimate Items Manually

To add items manually:

  1. Open the Estimates module in your project.

  2. Click Add Item.

  3. Select the type of item you want to create.

Buildern supports several estimate item types:

  • Group – Organize estimate items into sections.

  • Cost Catalog Item – Use predefined cost catalog entries.

  • Material – Add material costs required for the project.

  • Labor – Include workforce expenses.

  • Equipment – Add equipment-related costs.

  • Subcontractor – Record subcontractor services.

  • Fee – Add administrative or service fees.

  • Allowance – Include estimated budget placeholders.

  • Assembly – Add a group of predefined estimate items.

Create and Configure Estimate Items

In Buildern, several estimate item types share the same creation window and follow the same configuration process.

These include:

  • Material

  • Labor

  • Equipment

  • Subcontractor

  • Fee

  • Allowance

These item types represent actual project costs and are configured using the same set of fields.

Configure Item Fields

When creating a cost-based item, fill in the following fields:

Basic Information

  • Name – A clear and descriptive item name

  • Group (optional) – Assign the item to a group

  • Cost code – Used for cost tracking and reporting
    ​

​

πŸ’‘Tip - When entering the Name, you can select items from the Cost Catalog, which will automatically populate the item details.

πŸ’‘ Tip - Use the available Tips icons for additional guidance when needed.

Cost & Quantity

  • Quantity – Number of units required

  • Unit type – Measurement unit (e.g., hours, days, each)

  • Unit cost – Cost per unit

  • Markup % (optional) – Additional percentage for profit or overhead

  • Bid Requests - Create and manage bid requests
    ​​

ℹ️ Note – If taxes are configured in your account settings, the Unit Tax and Unit Cost (incl. tax) fields will be populated automatically. When a tax percentage is set in the system, it is applied to the Unit Cost (excl. tax), and Buildern automatically calculates the final Unit Cost (incl. tax).

πŸ’‘ Tip - In the Quantity field, you can use measurements (entered manually or from takeoff), apply formulas, or use the built-in calculator for quick calculations.

 

πŸ‘‰ Learn more about How to Work with Takeoff Measurements

ℹ️Note - Configure pricing details including unit cost, tax, and markup. Pricing settings such as tax configuration can also be managed in Settings.

 

πŸ‘‰ Learn more about How to Customize Taxes in Buildern

Description & Notes

  • Description – Visible to the client in the proposal

  • Internal note – Visible only to your team

Attachments & Organization

  • Attachments – Add related files

  • Selection – Assign to a predefined selection
    ​

ℹ️Note - You can also create Selections and Bid Requests after the item is created.

Calculation & Visibility

  • Calculate in total – Include the item in total cost

  • Visible in proposal – Show or hide the item for the client

  • Show amount in proposal as – Control how the price is displayed
    ​

 

Add Items Directly from the Estimate Table

In addition to using the Add Item button, you can also add new estimate items directly from within the estimate table.

To do this:

  • Scroll to the bottom of your estimate

  • Click Add new line to quickly create a new item

  • Or click More Types to choose a specific item type (e.g., Material, Labor, Assembly, etc.)

This allows you to continue building your estimate without leaving the table view and helps speed up the item creation process.

Add Items from the Cost Catalog

Buildern allows you to quickly add estimate items using your Cost Catalog, helping you save time and maintain consistency across estimates.

To add items from the Cost Catalog:

  • Click Add Item

  • Select Cost Catalog Item

  • Browse or search for the item you want to use

  • Select the item to add it to your estimate
    ​

Once selected, Buildern will automatically populate key fields such as name, unit cost, unit type, and description.

Important Behavior

When creating Material or Equipment items, you can add Labor directly.

In this case, the item will automatically be converted into an Assembly.

Finalize the Item

Once all fields are configured:

  1. Review the calculated totals at the bottom (cost, markup, tax, total amount)

  2. Click Add Item to save

Next Step: Create a Proposal

After completing your estimate, you can easily turn it into a client-ready proposal directly in Buildern.

 

πŸ‘‰ Learn more about How to Create a New Proposal in Buildern

Continue reading to uncover more ways to work efficiently in Buildern.
​