How to Import a Cost Catalog from Excel in Buildern

How to Import a Cost Catalog from Excel in Buildern

Importing a Cost Catalog in Buildern allows you to quickly add multiple items at once instead of creating them manually. In this article, you will learn how to import Cost Catalog items using different available methods.

July 31, 2026

📋 Requirements

Before importing a Cost Catalog, make sure:

  • You have the required permissions

  • Your Cost Codes / Categories are already configured

  • The target category for import is created in advance

 

Access the Cost Catalog

To import items:

  1. Click the 9-dot grid icon in the upper-right corner

  2. Select Cost Catalog

Import Cost Catalog Items

To start importing:

  1. Click the Import button in the upper-right corner

  2. Select one of the available import options

Buildern supports importing data from multiple applications, including Excel, Buildertrend, Buildxact, Xero, Procore, and more. In this guide, we will focus on importing using Excel.

Import from Excel

This is the most commonly used method for importing Cost Catalog items.

Step 1: Download the Template

  1. Select Excel

  2. Click Continue

  3. Download the provided template

Step 2: Prepare Your File

Fill in the template with your data.

Make sure required fields such as Name, Cost Type, Unit, and Unit Cost are completed correctly.

💡 Tip - Ensure that category names in your file match the categories in Buildern to avoid mapping issues.

Step 3: Upload the File

  1. Upload your completed file

  2. Buildern will open the import preview window

In the import window:

  • Review the uploaded data

  • Match your file columns to Buildern fields

💡 Tip - If a column is not needed, you can leave it unmapped. Only required fields must be matched.

At the top of each column, you will see a dropdown menu that allows you to define how your file data maps to Buildern fields.Use these dropdowns to match each column from your file to the correct field in Buildern.

In the top-right corner of the import window, you can also choose how your pricing is interpreted:

  • Tax excluded – Use this option if your file contains prices without tax

  • Tax included – Use this option if your prices already include tax

Step 4: Complete Import

Click Import to finalize the process.

All items will be added to the selected category in your Cost Catalog.

ℹ️ Note- Imported items behave like regular Cost Catalog items and can be edited or used in estimates at any time.

There’s more to explore in Buildern, and we’ll cover it in the upcoming tutorials.